Add constraints to a conservation planning problem
to ensure
that specific planning units are not selected
(or allocated to a specific zone) in the solution. For example, it may be
useful to lock out planning units that have been degraded and are not
suitable for conserving species. If specific planning units should be locked
in to the solution, use add_locked_out_constraints
. For
problems with non-binary planning unit allocations (e.g. proportions), the
add_manual_locked_constraints
function can be used to lock
planning unit allocations to a specific value.
add_locked_out_constraints(x, locked_out)# S4 method for ConservationProblem,numeric
add_locked_out_constraints(x, locked_out)
# S4 method for ConservationProblem,logical
add_locked_out_constraints(x, locked_out)
# S4 method for ConservationProblem,matrix
add_locked_out_constraints(x, locked_out)
# S4 method for ConservationProblem,character
add_locked_out_constraints(x, locked_out)
# S4 method for ConservationProblem,Spatial
add_locked_out_constraints(x, locked_out)
# S4 method for ConservationProblem,Raster
add_locked_out_constraints(x, locked_out)
ConservationProblem-class
object.
Object that determines which planning units that should be locked out. See the Details section for more information.
ConservationProblem-class
object with the constraints
added to it.
The locked planning units can be specified in several different
ways. Generally, the locked data should correspond to the planning units
in the argument to x.
To help make working with
Raster-class
planning unit data easier,
the locked data should correspond to cell indices in the
Raster-class
data. For example, integer
arguments
should correspond to cell indices and logical
arguments should have
a value for each cell---regardless of which planning unit cells contain
NA
values.
integer
vector
of indices pertaining to which
planning units should be locked in the solution. This argument is only
compatible with problems that contain a single zone.
logical
vector
containing TRUE
and/or
FALSE
values that indicate which planning units should be locked
in the solution. This argument is only compatible with problems that
contain a single zone.
matrix
containing logical
TRUE
and/or
FALSE
values which indicate if certain planning units are
should be locked to a specific zone in the solution. Each row
corresponds to a planning unit, each column corresponds to a zone, and
each cell indicates if the planning unit should be locked to a given
zone. Thus each row should only contain at most a single TRUE
value.
character
field (column) name(s) that indicate if planning
units should be locked in the solution. This type of argument is only
compatible if the planning units in the argument to x
are a
Spatial-class
or data.frame
object. The fields
(columns) must have logical
(i.e. TRUE
or FALSE
)
values indicating if the planning unit is to be locked in the solution.
For problems containing multiple zones, this argument should contain
a field (column) name for each management zone.
Raster-class
planning units in x
that intersect with non-zero and non-NA
raster cells are locked
in the solution. For problems that contain multiple zones, the
Raster-class
object must contain a layer
for each zone. Note that for multi-band arguments, each pixel must
only contain a non-zero value in a single band. Additionally, if the
cost data in x
is a Raster-class
object, we
recommend standardizing NA
values in this dataset with the cost
data. In other words, the pixels in x
that have NA
values
should also have NA
values in the locked data.
# NOT RUN {
# set seed for reproducibility
set.seed(500)
# load data
data(sim_pu_polygons, sim_features, sim_locked_out_raster)
# create minimal problem
p1 <- problem(sim_pu_polygons, sim_features, "cost") %>%
add_min_set_objective() %>%
add_relative_targets(0.2) %>%
add_binary_decisions()
# create problem with added locked out constraints using integers
p2 <- p1 %>% add_locked_out_constraints(which(sim_pu_polygons$locked_out))
# create problem with added locked out constraints using a field name
p3 <- p1 %>% add_locked_out_constraints("locked_out")
# create problem with added locked out constraints using raster data
p4 <- p1 %>% add_locked_out_constraints(sim_locked_out_raster)
# create problem with added locked out constraints using spatial polygon data
locked_out <- sim_pu_polygons[sim_pu_polygons$locked_out == 1, ]
p5 <- p1 %>% add_locked_out_constraints(locked_out)
# }
# NOT RUN {
# solve problems
s1 <- solve(p1)
s2 <- solve(p2)
s3 <- solve(p3)
s4 <- solve(p4)
s5 <- solve(p5)
# plot solutions
par(mfrow = c(3,2), mar = c(0, 0, 4.1, 0))
plot(s1, main = "none locked out")
plot(s1[s1$solution_1 == 1, ], col = "darkgreen", add = TRUE)
plot(s2, main = "locked out (integer input)")
plot(s2[s2$solution_1 == 1, ], col = "darkgreen", add = TRUE)
plot(s3, main = "locked out (character input)")
plot(s3[s3$solution_1 == 1, ], col = "darkgreen", add = TRUE)
plot(s4, main = "locked out (raster input)")
plot(s4[s4$solution_1 == 1, ], col = "darkgreen", add = TRUE)
plot(s5, main = "locked out (polygon input)")
plot(s5[s5$solution_1 == 1, ], col = "darkgreen", add = TRUE)
# }
# NOT RUN {
# create minimal multi-zone problem with spatial data
p6 <- problem(sim_pu_zones_polygons, sim_features_zones,
cost_column = c("cost_1", "cost_2", "cost_3")) %>%
add_min_set_objective() %>%
add_absolute_targets(matrix(rpois(15, 1), nrow = 5, ncol = 3)) %>%
add_binary_decisions()
# create multi-zone problem with locked out constraints using matrix data
locked_matrix <- sim_pu_zones_polygons@data[, c("locked_1", "locked_2",
"locked_3")]
locked_matrix <- as.matrix(locked_matrix)
p7 <- p6 %>% add_locked_out_constraints(locked_matrix)
# }
# NOT RUN {
# solve problem
s6 <- solve(p6)
# create new column representing the zone id that each planning unit
# was allocated to in the solution
s6$solution <- category_vector(s6@data[, c("solution_1_zone_1",
"solution_1_zone_2",
"solution_1_zone_3")])
s6$solution <- factor(s6$solution)
# plot solution
spplot(s6, zcol = "solution", main = "solution", axes = FALSE, box = FALSE)
# }
# NOT RUN {
# create multi-zone problem with locked out constraints using field names
p8 <- p6 %>% add_locked_out_constraints(c("locked_1", "locked_2",
"locked_3"))
# }
# NOT RUN {
# solve problem
s8 <- solve(p8)
# create new column in s8 representing the zone id that each planning unit
# was allocated to in the solution
s8$solution <- category_vector(s8@data[, c("solution_1_zone_1",
"solution_1_zone_2",
"solution_1_zone_3")])
s8$solution[s8$solution == 1 & s8$solution_1_zone_1 == 0] <- 0
s8$solution <- factor(s8$solution)
# plot solution
spplot(s8, zcol = "solution", main = "solution", axes = FALSE, box = FALSE)
# }
# NOT RUN {
# create multi-zone problem with raster planning units
p9 <- problem(sim_pu_zones_stack, sim_features_zones) %>%
add_min_set_objective() %>%
add_absolute_targets(matrix(rpois(15, 1), nrow = 5, ncol = 3)) %>%
add_binary_decisions()
# create raster stack with locked out units
locked_out_stack <- sim_pu_zones_stack[[1]]
locked_out_stack[!is.na(locked_out_stack)] <- 0
locked_out_stack <- locked_out_stack[[c(1, 1, 1)]]
locked_out_stack[[1]][1] <- 1
locked_out_stack[[2]][2] <- 1
locked_out_stack[[3]][3] <- 1
# plot locked out stack
# }
# NOT RUN {
plot(locked_out_stack)
# }
# NOT RUN {
# add locked out raster units to problem
p9 <- p9 %>% add_locked_out_constraints(locked_out_stack)
# }
# NOT RUN {
# solve problem
s9 <- solve(p9)
# plot solution
plot(category_layer(s9), main = "solution", axes = FALSE, box = FALSE)
# }
Run the code above in your browser using DataLab