network_cof_hv_sub_cables: Network cost of Failure for HV Sub cables

Description

This function calculates network cost of failure for Sub cables (cf. section 7.6, page 87, CNAIM, 2021). Network cost of failure is used in the derivation of consequences of failure see cof().

Usage

network_cof_hv_sub_cables(
  sub_cable_asset_category,
  no_customers,
  kva_per_customer = "Default"
)

Value

Numeric. Network cost of failure.

Arguments

sub_cable_asset_category

String The type of Submarine cable asset category Option: sub_cable_asset_category = "HV Sub Cable".

no_customers

Numeric. The number of customers fed by an individual asset.

kva_per_customer

Numeric. If the asset have an exceptionally high demand per customer type in kVA per customer. A setting of "Default" results in a multiplication factor of 1 (cf. table 18, page 89, CNAIM, 2021).

Examples

Run this code
network_cof_hv_sub_cables(sub_cable_asset_category = "HV Sub Cable",
no_customers = 750, kva_per_customer = 51)