FrechetESPlot2DCl: Plots Frechet Expected Shortfall against confidence level
Description
Plots the ES of a portfolio against confidence level assuming extreme losses
are Frechet distributed, for specified confidence level and a given
holding period.
Usage
FrechetESPlot2DCl(mu, sigma, tail.index, n, cl, hp)
Arguments
mu
Location parameter for daily L/P
sigma
Scale parameter for daily L/P
tail.index
Tail index
n
Block size from which maxima are drawn
cl
Confidence level and should be a vector
hp
Holding period
Details
Note that the long-right-hand tail is fitted to losses, not profits.
References
Dowd, K. Measuring Market Risk, Wiley, 2007.
Embrechts, P., Kluppelberg, C. and Mikosch, T., Modelling Extremal Events for
Insurance and Finance. Springer, Berlin, 1997, p. 324.
Reiss, R. D. and Thomas, M. Statistical Analysis of Extreme Values from
Insurance, Finance, Hydrology and Other Fields, Birkhaueser, Basel, 1997,
15-18.
# Plots ES against vector of cl assuming Frechet Distribution for given parameters cl <- seq(0.9,0.99,0.01)
FrechetESPlot2DCl(3.5, 2.3, 1.6, 10, cl, 30)