Learn R Programming

⚠️There's a newer version (1.0) of this package.Take me there.

IQCC

Builds statistical control charts with exact limits for univariate and multivariate cases.

Copy Link

Version

Install

install.packages('IQCC')

Monthly Downloads

444

Version

0.7

License

GPL-2 | file LICENSE

Maintainer

Flavio M M Barros

Last Published

November 15th, 2017

Functions in IQCC (0.7)

cchart.T2.2

Phase II Hotelling Control Chart.
cchart.Xbar1

X-bar Shewhart Control Chart for phase I.
binomdata

Binomial Data.
c4

C4 Constant.
cchart.Xbar2

X-bar Shewhart Control Chart for phase II.
cchart.R

R control chart
d3

D3 Constant.
cchart.S

S Control Chart.
T2.1

Hotelling T2 Statistic for Phase I.
data.1

Hotelling Control Chart Phase I simulated data.
T2.2

Hotelling T2 Statistic for Phase II.
data.2

Hotelling Control Chart Phase II simulated data.
add.data

Updates the Hotelling Control Chart.
alpha.risk

False Alarm probability for the 3-sigma R chart.
moonroof

Moonroof
pistonrings

Piston Rings Data Set.
cchart.Xbar_R

X-bar and R control charts
remove.data

Remove an undesirable observation.
cchart.p

p-chart
softdrink

Soft Drink Data Set.
stats

Auxiliary statistics for the multivariate control chart.
cchart.u

u-chart
d2

D2 Constant.
table.const

Table of values for the constants d2, d3 and c4.
table.qtukey

Tukey Quantile Table
cchart.T2.1

Phase I Hotelling Control Chart.