Learn R Programming

RChronoModel (version 0.4)

PhaseDurationPlot: Plot of the marginal posterior densities of the duration of a phase

Description

This function draws the marginal posterior densities of the time elapsed between the minimum and the maximum of the dates included in a phase, and adds summary statistics (mean, CI)

Usage

PhaseDurationPlot(PhaseMin_chain, PhaseMax_chain, level=0.95, title = "Duration of the phase", colors = T, GridLength=1024)

Arguments

PhaseMin_chain
numeric vector containing the output of the MCMC algorithm for the minimum of the dates included in the phase
PhaseMax_chain
numeric vector containing the output of the MCMC algorithm for the maximum of the dates included in the phase
level
probability corresponding to the level of confidence used for the credible interval and the time range
title
title of the graph
colors
if TRUE -> use of colors in the graph
GridLength
length of the grid used to estimate the density

Value

A plot with the marginal posterior densities of the duration of a phase and adds several summary statistics (mean, Credible interval, Time range)

Examples

Run this code
  data(Phases); attach(Phases)

  PhaseDurationPlot(Phase.1.alpha, Phase.1.beta, 0.95, "Duration of Phase 1")
  PhaseDurationPlot(Phase.2.alpha, Phase.2.beta, 0.95, "Duration of Phase 2",colors = FALSE)

Run the code above in your browser using DataLab