Calculates the iteration i'th for the control limits of c chart using the results obtained in c_gr and previous U_it iteration.
Usage
U_it(prev.results)
Value
in.control
The under control row list for the u chart
out.control
The out of control row list for the u chart
Iteraciones
The number of iterations, in this function always will be the first and the last one
data.0
The original data frame
data.1
Subsetting the data frame with under control rows
bin
The binary values for out of control equal to one and under control equal to zero
Limites de Control Grafica u
The u chart control limits vector
Conclusion del proceso
The same results in a phrase as the bin values
Arguments
prev.results
Is a list of previous results obtained by the u_gr function. In other cases, needs more than one iteration, to obtain the true control limits for u chart before take conclusions about the process.
Author
Erick Marroquin
References
Montgomery, D.C. (2005) Introduction to Statistical Quality Control, 5th ed. New York: John Wiley & Sons, ISBN 0-471-65631-3