est_g0: estimate g from fitted pk and cp models and search schedule
Description
Given a fitted pk model (from est_pk0), a fitted
cp model (from est_cp0 or a survreg object), and a
search schedule, estimate detection probability.
Usage
est_g0(pkmodel, cpmodel, days, a = NULL, v = NULL, ...)
Value
list of parameters for a beta distributions fit to the vectors of
for \(\hat{g}\) for the searched area within the period monitored
($BabRaw), for the whole site within the period monitored
($Bab), and for the whole site extrapolated to the whole year
($BabAnn). In addition, the models and parameters that went into the
estimate are included as well (pkmodel, cpmodel, a, v).
Arguments
pkmodel
fitted pk model (from est_pk0)
cpmodel
fitted cp model (from est_cp0 or survreg object)
days
vector of days since searches begin (days[1] == 0)
a
fraction of carcasses arriving in the area searched
v
fraction of carcasses arriving in the period spanned by the monitoring