plot_occupancy_duration_curve: Plot the occupancy duration curve
Description
This term is based on the "load duration curve" and is useful to see the
behavior of occupancy over the time in your charging installation.
The steeper the curve, the shorter the duration that higher number of connections
are sustained. Conversely, the flatter the curve, the longer the duration that
higher number of connections are sustained.
This information is crucial for various purposes, such as infrastructure planning,
capacity sizing, and resource allocation.