powertrend(trend = 1, A1 = NULL, PSE = NULL, pserel = 1, maxyrs = 3, pR = 100, step = 5, alpha = 0.05, tail = 2, graph = TRUE)
years
), trend selected (trend
), the PSE (pse
),
alpha level (alpha
), tail of test (tail
), percent change (R
) over maxyrs
, and power (power
).
maxyrs
), estimates of sample variability (PSE
) and abundance-PSE relationship (pserel
),
and percent rate of change. The program calculates power for each step
increment beginning at -100 percent for declining changes
and ending at pR
percent for increasing changes. See Gerrodette (1987;1991)
for full details. It is assumed that time intervals between samplings is equal.
Gerrodette, T. 1991. Models for power of detecting trends - a reply to Link and Hatfield. Ecology 72(5): 1889-1892.