powered by
Function to generate baseline dates given an end date and test length, plus optional guard, and length of baseline
get_baseline_dates(end_date, test_length, baseline_length, guard = 0)
vector of dates
End date of the test interval
(integer) length of the test interval in days
(integer) length of baseline period in days
(integer) default = 0; buffer between end of baseline and start of test interval
get_baseline_dates( end_date = "2025-01-01", test_length = 10, baseline_length = 90 )
Run the code above in your browser using DataLab