powered by
Function to generate test dates given an end date and test length
get_test_dates(end_date, test_length)
vector of dates
End date of the test interval
(integer) length of the test interval in days
get_test_dates( end_date = "2025-01-01", test_length = 10 )
Run the code above in your browser using DataLab