Determination of the intensity for the Neyman-Scott simulation.
Calculation of the threshold c, when having failure probability alpha.
Estimates the intensity of the point pattern by using the SPDE method from r-INLA.
Estimates the intensity of the point pattern.
Determination of the area of a high-risk zone using the nearest-neighbour distance.
Determination of necessary threshold to keep alpha in evaluation area
Determination of alpha and the threshold c which results
in a high-risk zone with desired area.
Print Brief Details of a bootstrap correction for a high-risk zone
Evaluation of the high-risk zone.
Summary of a the bootstrap correction for a high-risk zone
Simulation of the Neyman-Scott process.
Evaluation of the procedures determining the high-risk zone.
Determining high-risk zones by using spatial point process methodology
Visualize the bootstrap correction for a high-risk zone.
Print Brief Details of an evaluation of a high-risk zone
Summary of a the evaluation of a high-risk zone
Summary of a high-risk zone
Print Brief Details of a high-risk zone
Estimates the intensity of the point pattern.
Simulation on given intensity
Generation of a realisation of a Neyman-Scott process
Thinning of the observations (for evaluating the method)
Plot a high-risk zone
Visualize the evaluation of a high-risk zone.
Determination of high-risk zone on smaller area of interest (evaluation area) than observation area.
det_thresholdfromarea_rest
Determination of alpha and the threshold c which results
in a high-risk zone with desired area if a hole is present.
Read data, so it can be used for high-risk zone methodology.
Bootstrap correction to obtain desired failure probability
Calculation of the area of the high-risk zone.
calculation of alpha (failure probability), when having the threshold c
Bomb crater Point Pattern
Checks the arguments of det_hrz
check_det_hrz_restr_input
Checks the arguments of det_hrz_restr
Bootstrap correction to obtain desired failure probability
Bootstrap correction to obtain desired failure probability
Determination of failure probability within evaluation area
Determination of the nearest-neighbour distance which results in a high-risk zone with desired area
Determination of the high-risk zone.
Determination of the intensity for the Neyman Scott simulation.
Determination of the high-risk zone.
Bomb crater Point Pattern
Calculation of the area of the high-risk zone.
Estimation of width of a guard region given an estimated highriskzone