A data frame with 32 observations on the following 11 variables.
costcost of construction (in billions of dollars adjusted to a 1976
base)
datedate at which the construction permit was issued
T1time between application for and issue of permit
T2time between issue of operating license and construction permit
cappower plant capacity (in MWe)
PR1 if light water reactor already present on site
NE1 if constructed in north-east region of USA
CT1 if cooling tower used
BW1 if nuclear steam supply system manufactured by
Babcock-Wilcox
Ncumulative number of power plants constructed by each
architect-engineer
PT1 if partial turnkey plant