A data frame with 32 observations on the following 11 variables.
cost
cost of construction (in billions of dollars adjusted to a 1976
base)
date
date at which the construction permit was issued
T1
time between application for and issue of permit
T2
time between issue of operating license and construction permit
cap
power plant capacity (in MWe)
PR
1
if light water reactor already present on site
NE
1
if constructed in north-east region of USA
CT
1
if cooling tower used
BW
1
if nuclear steam supply system manufactured by
Babcock-Wilcox
N
cumulative number of power plants constructed by each
architect-engineer
PT
1
if partial turnkey plant