pi0An estimate of the proportion of true null hypotheses among all hypotheses (pi0=m0/m).
errorControlA Mutoss S4 class of type errorControl, containing the type of error controlled by the function and the level alpha.
Details
A non-linear step-down p-value procedure which control the FDR for independent test
statistics and enjoys more power then other non-adaptive procedure such as the linear step-up (BH).
For the case of non-independent test statistics, non-adaptive procedures such as the
linear step-up (BH) or the all-purpose conservative Benjamini-Yekutieli (2001) are recommended.